Design, manufacture and supply of equipment, construction and installation, warranty and maintenance of energy facilities.

Three projects in the city of Kamenskoye, Dnipropetrovsk region. with the installation of new solid fuel boilers.

Already this month, the references of CHENKO-BUD were presented by three projects for the replacement of natural gas.

Ongoing projects are the reconstruction of urban gas heating boiler houses, with the installation of new solid fuel boilers.

Already at the start of design, all engineering solutions are discussed in detail and worked out using 3D modeling tools..

According to the decision of the investor of Trade Invest Holding projects, for two projects (Altayskaya St. and Koleusovskaya St.), new boilers with production burners were selected, the company «ECO MODUL-UKRANA» (Kharkov). On the street Altai will be installed 4 boilers of 1.5 MW, on the street. Koleusovskaya – 3 boilers of 1.5 MW each.

ECO MODUL-UKRAINE company has patented the “Stehio” burner brand, power from 20 to 2000 kW, which has a high efficiency with a wide range of fuel consumed. The uniqueness of these burners is a stable and uninterrupted operation on any other pellets.

For the third project (Dalnaya St.), the boilers of the «Brovarsky Ardenz boiler equipment factory» were selected. The plant produces solid fuel boilers with mechanical fuel supply with power from 100 kW to 6 MW. The project will install 4 boilers with a capacity of 2 MW each.

 

Preliminary 3D study on the street. Altai.

Total power 6 MW

 

Preliminary 3D study on the street. Koleisovskaya.

Total power 4.5 MW

 

Preliminary 3D study on the street. Far.

Total power 6 MW