Design, manufacture and supply of equipment, construction and installation, warranty and maintenance of energy facilities.

Production of granular superphosphate with a capacity of 500 t / day

  This technology is well described in textbooks, but thanks to the scientific approach, practical and laboratory tests, as well as the development of equipment of the 21st century, it was possible to achieve a significant improvement in performance.

  We will tell you the details of the technology and its advantages later. Let’s prepare the technology for replication!

  In the meantime, we present a video chronology of the implementation of the project in the Arab Republic of Egypt.

The chronology included a little excursion part)). For those wishing to see more, write. There is even a photo and video in the very heart of the Cheops pyramid.