Our projects
The company CHENKO-BUD has serious experience in performing design and survey work for industrial enterprises of Ukraine.
Reference LLC «CHENKO-BUD» for the implementation of design and exploration work
https://chenko-bud.com/wp-content/uploads/2021/01/Reference-list-28.01.21-EN.pdf
№ | Our projects | Power, MW | Project start year | Fuel | Stage of implementation |
1. | "Energy complex for the generation of electricity 8,5 MW biofuel " LLC "Plant Kobzarenko" | 30 MW (heat) and 8,5 MW (electro) | 2021 | Hardwood fuel cod | Pre-design work See the letters of recommendation |
2. | 2nd stage of construction of the on-farm energy complex LLC "Vinnitsa Poultry Farm" for the production of electricity from biomass of plant and animal origin with a capacity of 12 MW (PJSC "MHP") | 49 MW (heat) and 12 MW (electro) | 2020 | The mixture is organic after growing chicken broilers | Pre-design work |
3. | “Reconstruction of heat supply networks Kharkov city. Department of communal services of Kharkov city council | 2020 | Working draft. Current work Photo |
||
4. | “Reconstruction of the boiler room with the installation of solid fuel boilers” LLC ECO MODUL-UKRAINE (UTS) | 6 MW (heat) | 2020 | Pellets made from the husks of sunflower | Working draft. Current work Photo |
5. | “Reconstruction of the boiler room with the installation of solid fuel boilers” LLC ECO MODUL-UKRAINE (UTS) | 4.5 MW (heat) | 2020 | Pellets made from the husks of sunflower | Working draft. Current work Photo |
6. | “Reconstruction of the boiler room with the installation of solid fuel boilers” LLC ECO MODUL-UKRAINE (UTS) | 8 MW (heat) | 2020 | Pellets made from the husks of sunflower | Working draft. Current work Photo |
7. | Technical re-equipment of the coal-fired boiler house of the Pavlopolskaya section of the Mariupol RPU KP «Company «Water of Donbass» | 1 MW (heat) | 2019 | Coal | Working draft. Work completed. See the letters of recommendation |
8. | “Reconstruction of a production boiler room with the installation of a solid fuel steam boiler 2 t / h (DP "BEST ALTERNATIVE") | 1.5 MW (heat) | 2019-2020 | Sunflower husk | Examination and commissioning. Current work. Photo Feedback |
9. | “New construction of a steam boiler house with a steam capacity of 15 t / h” ("VAM", Vietnam) | 10 MW (heat) and 0.63 MW (electro) | 2019 | Municipal solid waste (MSW) | Feasibility study Work completed See feedback. Photo Feedback Video |
10. | Energy complex for the generation of electricity 12 MW for LLC "Vinnitsa Poultry" (PJSC "MHP") | 25 MW (heat) and 12 MW (electro) | 2018 | The mixture is organic after growing chicken broilers | Design and Detailed Design. The work is completed. Photo |
11. | New construction of solid fuel boiler PJSC «Mironovskaya Poultry Farm"»(MHP) | 20 MW (heat) | 2018 | The mixture is organic after growing chicken broilers | Project и Detail designing. The work is completed. Video Feedback |
12. | New construction «Energy complex for the generation of electricity on biofuel 6 MW» Dneproenergo Resource LLC («Agro-Industrial Corporation "Dneprovskaya" Ltd.) 2nd turn | 17 MW (heat) and 6 MW (electro) | 2018 | Laying the poultry houses | Technical feasibility. The work is completed. Photo |
13. | «The energy complex for the production of electricity on biofuel 6 MW» LLC «VZRM» (Nasha Oliya Group) | 20 MW (heat) and 6 MW (electro) | 2018 | Sunflower husks | Technical feasibility. The work is completed. Photo Feedback Video |
14. | Boiler house on solid fuel 5.3 MW. The first starting complex – 4 MW. Biogas production site number 1 LLC «Vinnitsa Poultry Farm» «ENERGY SPECTRUM» («UNION OF ORGANIZATIONS OF INVALIDS OF UKRAINE ») | 4 MW (heat) | 2018 | Sunflower husks | The work is completed. Feedback |
15. | “Reconstruction of the steam pipelines entry site into the boiler room” (LLC Poultry complex Dneprovsky) (APGK Dneprovskaya) | 2018 | The work is completed. Photo |
||
16. | Reconstruction (replacement) of the gas-cleaning unit of the crushing department of the Zheltokmenny open pit PrJSC HTZ | 2017 | The work is completed. Photo |
||
17. | Technical re-equipment of the boiler house of PJSC «ADM Ilyichevsk» with the replacement of flue gas cleaning equipment ADM | 20 MW (heat) | 2017 | Sunflower husks | The work is completed. Feedback Photo |
18. | Engineering surveys of a new boiler house of 25 t / h in the territory PJSC «Volchansky OIE» (Kernel) | 15 MW (heat) | 2016 | Sunflower husks and waste cleaning sunflower | The work is completed. Feedback |
19. | New construction «Heat networks for heating poultry houses №1-№39» (LLC «Poultry complex" Dneprovsky») | 8 MW (heat) | 2016 | The work is completed. Feedback |
|
20. | New construction «Energy complex for the generation of electricity on biofuel 6 MW» Dneproenergo Resource LLC (APGK «Dneprovskaya») 1st turn | 8 MW (heat) | 2015 | Laying the poultry houses | The project is implemented. Feedback Photo |
References of specialists of LLC «CHENKO-BUD» in design and construction
№ | Name of the project | Power, MW | Project start year | Fuel | Stage of implementation |
1. | «The complex for the production of heat on biomass (straw) with a capacity of 5,0 MW» LLC «Poultry complex «Dneprovsky» (Agro-Industrial Corporation «Dneprovskaya» Ltd.) | 2x5=10 MW (heat) | 2012 | Straw | Project implemented. Feedback Article Photo |
2. | «Drying branch of the feedstock for the plant for production of slag-cement binder» | 4 MW (heat) | 2012 | Coal | Project implemented. Photo |
3. | «Reconstruction of the boiler room to ensure facilities PE «Oliyar» thermal energy» | 14 MW (heat) | 2012 | Coal | Project implemented. Photo |
4. | «Reconstruction of the boiler room UHZ» | 15 MW (heat) | 2012 | Coal | Project implemented. Photo |