Design, manufacture and supply of equipment, construction and installation, warranty and maintenance of energy facilities.

Our projects

The company CHENKO-BUD has serious experience in performing design and survey work for industrial enterprises of Ukraine.

 

Reference LLC «CHENKO-BUD» for the implementation of design and exploration work

https://chenko-bud.com/wp-content/uploads/2021/01/Reference-list-28.01.21-EN.pdf

 

Our projectsPower,
MW
Project start yearFuelStage of implementation
1."Energy complex for the generation of electricity
8,5 MW biofuel "
LLC "Plant Kobzarenko"
30 MW
(heat)
and
8,5 MW
(electro)
2021Hardwood fuel codPre-design work
See the letters of recommendation

2.

2nd stage of construction of the on-farm energy complex
LLC "Vinnitsa Poultry Farm" for the production of electricity from biomass of plant and animal origin with a capacity of 12 MW
(PJSC "MHP")
49 MW
(heat)
and
12 MW (electro)
2020The mixture is organic after growing chicken broilersPre-design work
3.“Reconstruction of heat supply networks
Kharkov city.
Department of communal services of Kharkov city council
2020Working draft.
Current work
Photo
4.“Reconstruction of the boiler room with the installation of solid fuel boilers”
LLC ECO MODUL-UKRAINE (UTS)
6 MW
(heat)
2020Pellets made from the husks of sunflowerWorking draft.
Current work
Photo
5.“Reconstruction of the boiler room with the installation of solid fuel boilers”
LLC ECO MODUL-UKRAINE (UTS)
4.5 MW
(heat)
2020Pellets made from the husks of sunflowerWorking draft.
Current work
Photo
6.“Reconstruction of the boiler room with the installation of solid fuel boilers”
LLC ECO MODUL-UKRAINE (UTS)
8 MW
(heat)
2020Pellets made from the husks of sunflowerWorking draft.
Current work
Photo
7.Technical re-equipment of the coal-fired boiler house of the Pavlopolskaya section of the Mariupol RPU KP
«Company «Water of Donbass»
1 MW
(heat)
2019CoalWorking draft.
Work completed.
See the letters of recommendation
8.“Reconstruction of a production boiler room with the installation of a solid fuel steam boiler 2 t / h
(DP "BEST ALTERNATIVE")
1.5 MW
(heat)
2019-2020Sunflower huskExamination and commissioning. Current work.
Photo
Feedback
9.“New construction of a steam boiler house with a steam capacity of 15 t / h”
("VAM", Vietnam)
10 MW
(heat)
and
0.63 MW (electro)
2019Municipal solid waste
(MSW)
Feasibility study
Work completed
See feedback.
Photo
Feedback
Video
10.Energy complex for the generation of electricity 12 MW for LLC "Vinnitsa Poultry"
(PJSC "MHP")
25 MW
(heat)
and
12 MW (electro)
2018The mixture is organic after growing chicken broilersDesign and Detailed Design. The work is completed.
Photo
11. New construction of solid fuel boiler
PJSC «Mironovskaya Poultry Farm"»(MHP)
20 MW (heat)2018The mixture is organic after growing chicken broilersProject и Detail designing.
The work is completed.
Video
Feedback
12. New construction «Energy complex for the generation of electricity on biofuel 6 MW»
Dneproenergo Resource LLC
(«Agro-Industrial
Corporation "Dneprovskaya" Ltd.
)
2nd turn
17 MW (heat)
and
6 MW
(electro)


2018Laying the poultry housesTechnical feasibility.
The work is completed.
Photo
13. «The energy complex for the production of electricity on biofuel 6 MW»
LLC «VZRM»
(Nasha Oliya Group)
20 MW (heat)
and
6 MW
(electro)
2018Sunflower husksTechnical feasibility.
The work is completed.
Photo
Feedback
Video
14. Boiler house on solid fuel 5.3 MW. The first starting complex – 4 MW.
Biogas production site number 1
LLC «Vinnitsa Poultry Farm»
«ENERGY SPECTRUM»
(«UNION OF ORGANIZATIONS OF INVALIDS OF UKRAINE »)
4 MW (heat)2018Sunflower husksThe work is completed.
Feedback
15. “Reconstruction of the steam pipelines entry site into the boiler room”
(LLC Poultry complex Dneprovsky)
(APGK Dneprovskaya)
2018The work is completed.
Photo
16. Reconstruction (replacement) of the gas-cleaning unit of the crushing department of the Zheltokmenny open pit
PrJSC HTZ
2017The work is completed.
Photo
17. Technical re-equipment of the boiler house of PJSC «ADM Ilyichevsk» with the replacement of flue gas cleaning equipment
ADM
20 MW (heat)
2017Sunflower husksThe work is completed.
Feedback
Photo
18. Engineering surveys of a new boiler house of 25 t / h in the territory
PJSC «Volchansky OIE» (Kernel)
15 MW (heat)2016Sunflower husks and waste cleaning sunflowerThe work is completed.
Feedback
19. New construction «Heat networks for heating poultry houses №1-№39»
(LLC «Poultry complex" Dneprovsky»)
8 MW (heat)2016The work is completed.
Feedback
20.New construction «Energy complex for the generation of electricity on biofuel 6 MW»
Dneproenergo Resource LLC
(APGK «Dneprovskaya»)
1st turn
8 MW (heat)

2015Laying the poultry housesThe project is implemented.
Feedback
Photo

 

References of specialists of LLC «CHENKO-BUD»  in design and construction

 

Name of the projectPower,
MW
Project start yearFuelStage of implementation
1. «The complex for the production of heat on biomass (straw) with a capacity of 5,0 MW»
LLC «Poultry complex «Dneprovsky» (Agro-Industrial Corporation «Dneprovskaya» Ltd.)
2x5=10 MW
(heat)


2012StrawProject implemented.
Feedback
Article
Photo
2. «Drying branch of the feedstock for the plant for production of slag-cement binder»4 MW
(heat)
2012CoalProject implemented.
Photo
3. «Reconstruction of the boiler room to ensure facilities PE «Oliyar» thermal energy»
14 MW
(heat)
2012CoalProject implemented.
Photo
4. «Reconstruction of the boiler room UHZ»15 MW
(heat)

2012CoalProject implemented.
Photo